2021年9⽉The upgrade of Star Trek 2.0 product is completed, and the external trust authorization mechanism is realized.
2021年6⽉Insurance was officially launched, and the final piece of the credit evaluation system infrastructure was completed.
2021年5⽉Upgrade of liquid products and operation and maintenance of existing products.
2021年4⽉Officially launched the T.Lending product, and completed the puzzle of the third letter evaluation system.
2021年3⽉The prototype design and development of loan and insurance products were completed.
2021年2⽉"Star Trek 2077" products entered the stage of functional development, and the product performance and official release were completed.
2021年1⽉GFC liquidity products were officially launched.
2020年12⽉Christmas holiday.
2020年11⽉Complete the product logic verification of Star Trek 2077 and successfully verify the business model of state mining.
2020年10⽉GFC products are redone, and the product prototype diagram is redesigned.
2020年9⽉The prototype drawing of GFC project is completed, and the design and basic research and development are completed.
2020年7⽉GFC item preliminary feasibility exploration, product logic combing.
2020年5⽉The design of CC public chain performance is completed, and the design of credit evaluation system is completed.